Cross River Rail
​
Project Overview: Relocation - twin bores completed during possession
​
Location: Dutton Park Qld
​
Ground Conditions: OTR and rock
​
Asset Owner: Telstra
​
Length: 140m Pipe: 4 x 110mm
NSW Sydney Trains
​
Project Overview: Rail ninety multiple length bores for electrical and communications upgrade. Significant input into design in conjunction with client.
​
Ground Conditions: OTR and Rock
​
Asset Owner: Transport NSW
Length: 4.5km Pipe: 65mm and 110mm
Wickham Transport Interchange
Project Overview: Rail two bores of 400mm to 450mm pipe. Complex site with numerous services – detailed design assistance provided.
Location: Newcastle NSW
​
Ground Conditions: OTR
​
Asset Owner: Transport NSW
Length: 400 metres Pipe: 400mm and 450mm