RAIL

Cross River Rail

​

Project Overview:  Relocation - twin bores completed during possession

​

Location: Dutton Park Qld

​

Ground Conditions: OTR and rock

​

Asset Owner: Telstra

​

Length: 140m  Pipe: 4 x 110mm

Picture1.jpg
NSW Sydney Trains

​

Project Overview: Rail ninety multiple length bores for electrical and communications upgrade. Significant input into design in conjunction with client. 

​

Ground Conditions: OTR and Rock

​

Asset Owner: Transport NSW

 

Length: 4.5km  Pipe: 65mm and 110mm

nsw_transport_trains_logo_detail.png
Wickham Transport Interchange

Project Overview: Rail two bores of 400mm to 450mm pipe. Complex site with numerous services – detailed design assistance provided.

 

Location: Newcastle NSW

​

Ground Conditions: OTR

​

Asset Owner: Transport NSW

 

Length: 400 metres  Pipe: 400mm and 450mm

Laing-O-Rourke_.png